01 / New home builds
Services / 05 of 08

New home builds, slab to handover.

Fit-out · Complete wire up

Electrical fit-out and complete wire up, from slab to handover. We work to your program, keep the site clean, and give you one contact who answers the phone.

Quote this → All services

What it covers

5 parts · select one for the full scope
05.1 · Scope of works

Plan mark-up

Before rough-in we walk the slab or frame with you and mark every point, so nothing is guessed.

AS/NZS 3000
Quote this →
Included
  1. 01Review of electrical plans and specifications
  2. 02Walk-through with owner or builder
  3. 03Power, light and switch positions marked
  4. 04Data, TV and security points
  5. 05Appliance and air-conditioning requirements
  6. 06Variations priced in writing
On completion
  • Marked-up electrical plan
  • Confirmed quote with inclusions
05.2 · Scope of works

Rough-in

All cabling and boxes installed before linings, to the agreed plan and the builder’s program.

AS/NZS 3000 AS/NZS 3008.1.1
Quote this →
Included
  1. 01Consumer mains and meter box
  2. 02Cabling for power, lighting and appliances
  3. 03Switch and outlet box placement
  4. 04Data and TV cabling
  5. 05Conduits for future runs
  6. 06Pre-lining inspection
On completion
  • Photos of all cable runs before lining
  • Rough-in sign-off with the builder
05.3 · Scope of works

Fit-off & wire up

Once linings and paint are done, everything is terminated, fitted and tested.

AS/NZS 3000 AS 3786
Quote this →
Included
  1. 01Switchboard fit-out with RCBO protection
  2. 02Power points, switches and light fittings
  3. 03Interconnected smoke alarms
  4. 04Exhaust fans and range hood
  5. 05Oven, cooktop and air-conditioning connections
  6. 06Final testing of every circuit
On completion
  • Circuit schedule at the board
  • Test results
05.4 · Scope of works

Provisions

Wiring for what comes later, so solar, batteries and EV charging can be added without opening walls.

AS/NZS 3000
Quote this →
Included
  1. 01Lighting layout advice
  2. 02Solar and battery conduit to the board
  3. 03EV charger circuit or conduit to the garage
  4. 04Spare board capacity
  5. 05Data rack and network points
  6. 06Outdoor and landscape lighting
On completion
  • Provisions recorded on the as-built plan
05.5 · Scope of works

Certification

Tested, certified and documented, ready for handover on the day.

AS/NZS 3000 AS/NZS 3017
Quote this →
Included
  1. 01Insulation resistance and polarity testing
  2. 02RCD trip-time testing
  3. 03Earth continuity testing
  4. 04Network connection coordination
  5. 05Energisation
  6. 06Handover walk-through
On completion
  • Certificate of compliance
  • As-built circuit schedule
  • Warranty and appliance documents
For builders

We work to your program, keep the site clean, and give you one contact who answers the phone.

What we look at first
Plans Marked up and agreed before rough-in.
Program Booked to your schedule, not ours.
Handover Certificates in the pack on the day.

Price your build.

Request a call back →

Tell us the site and what you want powered. We come back with an itemised price and a date.

EC16867  ·  PL 11344  ·  GF 24561  ·  S6164924  ·  Public liability insured to $20,000,000 with QBE